Integration Schedule allows Client Administrators to:
- set the schedule for RISE and Reverse RISE (recurring and on demand)
- review the log for past integrations
- set parameters for key Reverse RISE export tables
Schedule tab
Purpose: set RISE import and Reverse RISE export schedules whether recurring or on demand.
RISE System Process:
- Client Server pings rBudget every five minutes looking for a scheduled recurring or one-time task.
- If there is a scheduled recurring or on-time task in the grid, the rBudget server will alert RISE to begin the transfer process.
Add-Edit-Delete:
- Add allows user to create a new recurring or one-time task
- Edit allows user to modify an existing task
- Delete allows user to delete an existing task
| Field | Data Entry Type | Options |
| Integration Schedule | Drop-down list |
|
| Type | Drop-down list |
|
| Interval | Drop-down list |
|
| Is Active | Checkbox |
|
|
Start Date |
Type in manually or use calendar icon | Enter first date to run import/export |
|
Time |
Enter manually (0-24 hr: PST) | hh:mm |
|
Expires On |
Type in manually or use calendar icon | Enter the last date to run import/export |
|
Chart |
Drop-down list | Chart of Accounts at Client Admin level |
Info: The Scheduled Task: toolbar contains a Note: informing when the next import job is scheduled.
Log tab
The Log Tab is a list of processed integration tasks and details and contains a Filter By: Date: utility, used to assist in locating processed tasks.
Session - Unique number by executed RISE job: Import to rSquared via Session #. Export to Client via Session #.
Integration Task
Status - Success, In Progress, Scheduled, Failed
Date Process - Job launch; Pacific Standard Time (PST)
Param Type
Param
Successful RISE Job will appear as follows in the Log:
1st entry: Authorization for the scheduled import
2nd entry: Successful Upload of zip file
3rd entry: Successful Upload of log file
4th entry: Successful Import from JDE of data
Successful Reverse RISE Job will appear as follows in the Log:
1st entry: Authorization for the scheduled export
2nd entry: In progress creation of export database
3rd entry: Successful backup zip file created
4th entry: Successful drop of backup file to designated folder
5th entry: Successful upload of log file (.txt.)
6th entry: Successful upload of zip file
Ping Log
Integration Task
Last Check - Pacific Standard Time (PST)
Settings
Note: The Settings tab is currently not in use. For any user-defined metrics to be added to the Reverse RISE export, please notify rSquared of the metric.